Article 6 recognition

The BTR-first pathway that gets eligible tonnes recognized in January 2027. Where policy allows, matched annual information can open pre-BTR buyer windows; the BTR remains the anchor.

Government Run the readiness check or learn more about your lane. Government — Readiness Learn more
BTR-First · AEF parity · Milestone-escrowed

Why institutions choose BTR Prime

Single-ledger allocation

Priority bands and buyer windows in one ledger to prevent conflict and double-selling.

  • 1–15 Mt CO₂eq Priority bands per trader

Evidence-first releases

Each state change links to LoA records, IR drafts, CA documentation, AEF parity memos, and BTR anchors.

  • ≤ 30 days Engagement SLA with DNA focal points

ETF-guided cadence

Country sequencing follows MPGs and reporting windows; Article 6 cooperation proceeds in step with BTR drafting.

  • 5 Countries Founding Cohort
  • Jan 2027 Target BTR

Choose your lane

Developers

Align LoA → CA → AEF → BTR on a shared calendar; keep evidence packs publication-ready.

Explore Developers →

Traders

Reserve an allocation band (RFO/RFR) and track milestones tied to LoA, CA documentation, and BTR citation.

Explore Traders →

Governments

No fees to participate. Optional restricted, milestone-linked administrative support to resource compilation and coordination.

Explore Governments →

Donors

Match funding 1:1 with traders at the country level to create ~$1M per-country operating envelopes for rails, validator lane, and audit trail.

Explore Donors →

Strategic Alliances

Pair market access and capital with sovereign delivery on UNFCCC timelines; co-design portfolios anchored to BTR publication.

Explore Strategic Alliances →

Insurers

Co-brand Assured Pathway: analytics plus optional parametric cover keyed to BTR milestones and AEF parity. No pass-through to governments.

Explore Insurers →

How it works

Kick-off & roles

Institutional arrangements confirmed; DNA focal points named; BTR cadence & CA method set.

LoA templates adopted

Scope terms set; initial LoA filings prepared; records management readied.

Initial Report (IR) confirmation

IR elements confirmed for the cooperative approach; LoA links recorded.

Corresponding Adjustment logic

Policy rule for first transfer documented; CA evidence pathway and registry references mapped.

Pre-BTR confirmation (AEF parity)

Host ↔ acquiring Party entries match; parity memo + evidence pack issued. Early buyer window may open where policy allows.

BTR assembly & submission

Article 6 sections finalized; CA notes/citations included; transmission to UNFCCC.

Delivery-first vs legacy insurance

Delivery-first fixed tiers replace legacy revocation/CA insurance. By choosing a tier, you avoid the typical $3–$5 per tCO2e insurance spend.
Tier Mt CO2e Your price $/tCO2e Your fixed fee Avoided vs $3/tCO2e Avoided vs $5/tCO2e
Pilot 1.0 $0.50/tCO2e $0.50M $2.50M $4.50M
Strategic 2.5 $0.40/tCO2e $1.00M $6.50M $11.50M
Anchor 15.0 $0.33/tCO2e $5.00M $40.00M $70.00M

Notes: Figures illustrate typical market pricing; specific standards (e.g., CORSIA) may still require insurance. Delivery-first tiers reduce reliance on such cover and avoid the variable $/tCO2e spend shown.

Current cohort cadence

  • Founding: 5 countries by
  • Cohort-2 start:
  • Target publication:

Join Cohort-1

Name your country and tier; receive a one-page term sheet with escrow, caps, and the evidence pack list. Quiet urgency. Disciplined delivery.

Government — Readiness Talk to us